Following roads will be closed for roadwork and will be repoened at the end of the day:
- 800E (2150N to IL RT10) culvert C-44(riprap),
- 800E (IL RT10 to 2400N) culvlert C-45,
- 3200N (1000E to 1100E) culvert C-231,
- 800E (2150N to 2400N),
- 2500N (400E to CH5),
- 2600N (400E to CH5),
- 2150N ( 700E to 800E)
Following roads will be closed for roadwork and will be reopened 04/03/24:
- 700/725E (2750N to 3050N)
Following roads will be closed for roadwork and will be reopened 04/05/24
- 900E (2750N to US150)
The following work is anticipated for Tuesday 04/02/2024:
Roadway Prep.:
800 E between 2150 N and 2400 N
700 E between 2750 N and 3050 N
2500 N between 400 E and CH 5
900 E between 2750 N and 3050 N
2600 N between 400 E and CH 5
Tuesday 04/02/2024: Culvert Installation:
C-45 (Riprap) 800 E between IL Rt 10 and 2400 N
C-231 Riprap) 3200 N between 1000 E and 1100 E
Anticipated work can be altered by weather, equipment breakdowns, or any other unforeseen circumstance.
Do you like this post?