Plan of the Day: July 20 (Saturday)

The following roads will be closed and reopened at the end of the day:

  • 800E (from 2150N to 2400N) dust control seal coat
  • 2150N (from CH5 to 800E) dust control seal coat
  • 775E (from 2050N to 2150N) seal coat
  • 600E (from 2150N to 3rd street) seal coat

The following roads will be closed and reopened on 07/25/24:

  • 2600N (from County Line to CH5) soil cement cure

The following roads will be closed and reopened on 07/27/24:

  • 2400N (from CH5 to 700E) soil cement stabilization

 

 

In addition, the following the work is anticipated for Monday 07/22/24 and Tuesday 07/23/24:

Monday 07/22/24   Field Tile Repair           700E between 2150N and IL Rt 10 (C-106)
                               Cement Stabilization    2400N between 400E and CH 5
                               4" Aggregate Cap         700E between IL Rt 10 and 2400N

Tuesday 07/23/24  Culvert Installation        CH 10 between 900E and 1000E (C-34B)
                               Cement Stabilization    2500N between 400E and CH 5
                               4" Aggregate Cap          700E between 2150N and IL Rt 10

Anticipated work may be altered by inclement weather, equipment breakdowns, or any other unforeseen circumstance.