Plan of the Day: June 29 (Saturday)

The following roads will be closed and reopened at the end of the day:

  • 800E (from 2500N to 2600N) seal coat
  • 2500N (from 700E to 900E) seal coat
  • 700E (from substation to 2500N)

The following roads will be partially closed and reopened at the end of the day:

  • 2700N (from 700E to 800E) dirt shoulders
  • 800E (from 2500N to 2750N) dirt shoulders

The following roads will be closed and reopened on 07/03/24:

  • 800E (from IL RT10 to 2400N) soil cement cure

 

In addition, the following work is anticipated for Monday 07/01/2024 and Tuesday 07/02/2024:

07/01/2024:  Culvert Installation     775E between 2050N and 2150N (C-42)
                     Cement Stabilization  800E between 2200N and IL Rt 10
                     Pre Pulverization        2150N between 700E and 800E
                                                        700E between 2300N and 2400N
                     4" Aggregate Cap      2150N between CH 5 and 600E
                                                         600E between 2150N and 3rd St.

07/02/2024:  Culvert Installation    2150N between CH 5 and 600E (C-244B)
                     Cement Stabilization 775 E between 2050N and 2150N
                     Pre Pulverization       770 E between 2150N and 2300N
                                                       2400N between CH 5 and 700E
                      4" Aggregate Cap     2150N between 600E and 800E 

Anticipated work may be altered by inclement weather, equipment breakdowns, or any other unforeseen circumstances.