Roads will be closed for roadwork preparation:
CH5 (from 2400N TO 2500N) with culvert work at C-61,
1400E (from 3100N TO 3200n) with riprap at C-10,
700E (from 2700N to 3050N)
2500N (from 725E to 900E)
2750N (from CH5 to 1000E)
2600N (from CH5 to 400E)
900E (from 2600N to US150)
3100N (from CH2 to 1400E) with culvert work at C-12A,
2500n (from 400E to CH5) with culvert work at C-207,
Roads will reopen at the end of the day.
In addition, the following work is anticipated for Thursday 03/14/24 and Friday 03/15/24:
03/14/24:
Culvert installation CH 5 between 2300 N and 2400 N (C-247)
2500 N between 400 E and CH 5 (C-208)
Roadway Prep. 700 E between 2700 N and 3050 N
2500 N between 725 E and 900 E
2750 N between CH 5 and 1000 E
900 E between 2600 N and US 150
03/15/24:
Culvert installation 2500 N between 400 E and CH 5 (C-209)
1100 E between 3300 N and 3400 N (C-201)
Roadway Prep. 700 E between 2700 N and 3050 N
2500 N between 725 E and 900 E
2750 N between CH 5 and 1000 E
900 E between 2600 N and US 150
Anticipated work can be altered by weather, equipment breakdown or any other unforeseen circumstance.