Plan of the Day: March 18

Following roads will be closed for roadwork preparation:

800E (from 2300N to 2400N) with culvert work at C-46,
725E (from 2300N to 2400N) with culvert work at C-104,
1400E (from 3100N to 3200N) with culvert work at C-11,
2400N (from 400E to 725E),
2500N (from 725E to 900E),
2600N (from 400E to CH5),
725E (from IL RT10 to 2500N),
2750N (from CH5 to 1000E)

Roads will be reopened at the end of the day. 

 

In addition, the following work is anticipated  for tuesday 03/19/2024:

Tuesday 03/19/2024:  Culvert installation: C-105  725 E between 2150 N and 2300 N
                                                                   C-106  725 E between 2150 N and 2300 N
                                                                    C-11  1400 E between 3100 N and 3200 N

                                   Roadway Prep.:    2400 N between 400 E and 725 E
                                                                 2500 N between 400 E and CH 5
                                                                 2600 N between 400 E and CH 5
                                                                   725 E between IL Rt 10 and 2500 N

Anticipated work can be altered by weather, equipment breakdowns or any other unforeseen circumstance.