Following roads will be closed for roadwork and reopened at the end of the day 03/28/24:
- 800E (2150N to IL Rt10) culvert work C-44,
- 1100E (3300N to 3400N) culvert work C-237,
- 2600N (400E to CH5),
- 2500N (400E to CH5),
- 800E (2150N to 2400N)
- 2150N (525E to 800E)
Following roads will be closed for roadwork and will be reopened on 04/05/24
- 900E (2750N to US150)
- 725/700E (2750N to 3050N)
In addition, the following work is anticipated for Friday 03/29/2024:
Friday 03/29/2024: Culvert Installation:
C-45 (Riprap) 800 E between 2150 N and 2300 N
C-231 3200 N between 1000E and 1100 E
Roadway Prep.:
2600 N between 400 E and CH 5 600 E between 2150 N and 3rd St.
2500 N between 400 E and CH 5 2150 N between 525 E and 800 E
2400 N between 400 E and CH 5 775 E between 2050 N and 2150 N
800 E between 2150 N and 2400 N
Anticipated work may be altered by weather, equipment breakdowns or any other unforeseen circumstance.