The following roads will be closed and reopened by end of day 5/4
- 700 E (from 2750 N to 2900 N)
- 1200 E (from 3300 N to 3400 N)
- 900 E (from US 150 to 3300 N) Residents will have access from North
- 3200 N (from 900 E to CH 2)
The following roads will have closures with expected reopening of 5/6
- 1500 E (from 3200 N to 3300 N) Soil Cement Cure
- 900 E (from 2750 N to US 150) MC-30 Cure
The following roads will have closures with expected reopening of 5/7
- 3300 N (from 1400 E to 1500 E) Soil Cement Cure
The following roads will have closures with expected reopening of 5/8
- 1400 E (from 3200 N to 3300 N) Soil Cement Cure. Residents will have access to the south
The following roads will have closures with expected reopening of 5/9
- 1100 E (from 3300 N to 3400 N) Soil Cement Cure. Residents will have access to the south
In addition, the following work is anticipated for Monday 05/06/2024 and Tuesday 05/07/2024:
Monday 05/06/2024: Box Culvert Installation 2500 N between 400 E and CH 5 (C-210)
Field Tile Repair 1200 E between 3300 N and 3400 N
Cement Stabilization 1400 E between 3100 N and 3200 N
Pre. Pulverization 3100 N between CH 2 and 1400 E
Oil/Chip & Dirt Work 900 E between 2750 N and 3300 N
Add Rock 700 E between 2750 N and 3070 N
Tuesday 05/07/2024: Box Culvert Installation 2500 N between 400 E and CH 5 (C-210 RipRap)
Cement Stabilization 3100 N between CH 2 and 1400 E
Pre. Pulverization 1200 E between 3300 N and 3400 N
Add Rock 700 E between 2750 N and 3070 N
4" Aggregate Cap 1500 E between 3200 N and 3300 N
Anticipated work can be altered by weather, equipment breakdowns, or any other unforeseen circumstance.