Roadwork for 10/24/24:
- 2400N (from 400E to CH5) will be closed and reopened at the end of the day for C-100 culvert extension.
- 4"x6" wood post for sign posts thru jobsite
In addition, the following work is anticipated for Friday 10/25/24:
Friday 10/25/24: Culvert Extension at C-52 2750N between 800E and 900E
Wood sign posts thru jobsite
Anticipated work may be altered by inclement weather, equipment breakdowns, or any other unforeseen circumstances.
Do you like this post?